Spending decisions from legislatures, county commissions, city councils, school boards, utilities, and special districts — the votes that authorized public money. Amounts are stated approval dollars, never clean spend totals.
ApprovalAgenda Onlyagenda-only · not confirmed spend
Northeast Kingdom Special Loan Program
ApprovalAgenda Onlyagenda-only · not confirmed spend
Commercial Energy Loan Program
ApprovalAgenda Onlyagenda-only · not confirmed spend
Agricultural Energy Loan Program
ApprovalAgenda Onlyagenda-only · not confirmed spend
VEDA is Vermont’s economic development finance authority, staffed by a seasoned group of Vermont professionals. With over 300 years in combined lending experience, the VEDA team is dedicated to meeting the financing needs of Vermont businesses and farms. Since 1974, VEDA has provided $2.8 billion in low-interest financing to Vermonters
ApprovalAgenda Onlyagenda-only · not confirmed spend
Loan Participation Program (SSBCI)
ApprovalAgenda Onlyagenda-only · not confirmed spend
Montpelier Heating District Loan Program
ApprovalAgenda Onlyagenda-only · not confirmed spend
Revenue Bond Program for 501(c)(3)
ApprovalAgenda Onlyagenda-only · not confirmed spend
11. ANCHOR STANDBY GENERATOR, AND ANY OTHER LARGE EQUIPMENT TO CONCRETE SLAB PER ARCH CMU3 8" (1) #5 @ 24" O.C. HORIZ BOND NONE
ApprovalAgenda Onlyagenda-only · not confirmed spend
H AND CONFIRM SCOPE OF DEMOLITION PRIOR TO BID.
ApprovalAgenda Onlyagenda-only · not confirmed spend
(2) #4 CENTERED IN END OF BOND BEAM STEEL AROUND VERTICAL REINFORCEMENT, TYP. REINFORCING
ApprovalAgenda Onlyagenda-only · not confirmed spend
#5 HORIZ. BOND BEAM PL 1"x14"x12" @ HSS8x6.
ApprovalAgenda Onlyagenda-only · not confirmed spend
CMU2 12" (2) #5 @ 16" O.C. HORIZ BOND CELLS W/ FOAM OR LOOSE
ApprovalAgenda Onlyagenda-only · not confirmed spend
3. INFILL (E) DECK OPENINGS, RE: ARCH., MECH. & S3.2 -2 . CMU1 8" (1) #5 @ 16" O.C. HORIZ BOND CELLS W/ FOAM OR LOOSE
ApprovalAgenda Onlyagenda-only · not confirmed spend
SPRINKLER SYSTEM PRIOR TO BID. ANY QUESTIONS THAT AFFECT THE
ApprovalAgenda Onlyagenda-only · not confirmed spend
FS S 4 3 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
COLLAR, 4" HIGH "PAR-BOND" GUTTER SEAL 18"
ApprovalAgenda Onlyagenda-only · not confirmed spend
INSTALLATION SHALL BE IN AGREEMENT WITH THE OVERALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
RESTROOM RESTROOM 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
* HORIZ. BOND BEAM/CHORD @ ROOF LINE OF FULL HT. CMU - (2) #7 BARS SHEET TITLE
ApprovalAgenda Onlyagenda-only · not confirmed spend
3. Neither the claim asserted nor the relief requested requires the individual
ApprovalAgenda Onlyagenda-only · not confirmed spend
#5 BOND BEAM @ 48" O.C. W/
ApprovalAgenda Onlyagenda-only · not confirmed spend
TABLE N5.4-1 INSPECTION TASKS PRIOR TO WELDING: ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES 1. SPECIAL INSPECTIONS DESCRIBED HEREIN WILL BE PERFORMED UNDER SEPARATE CONTRACT BY AN APPROVED
ApprovalAgenda Onlyagenda-only · not confirmed spend
LOCATION / TYPE ROD WIRE SIZE VERT. SPACING STANDARD GRADE (ksi) 1. SPECIAL INSPECTIONS DESCRIBED HEREIN WILL BE PERFORMED UNDER SEPARATE CONTRACT BY AN APPROVED
ApprovalAgenda Onlyagenda-only · not confirmed spend
BM. BEAM N.I.C. NOT IN CONTRACT
ApprovalAgenda Onlyagenda-only · not confirmed spend
USE RUNNING BOND EXCEPT AS NOTED.
ApprovalAgenda Onlyagenda-only · not confirmed spend
2 CMU3 8" (1) #5 @ 24" O.C. HORIZ BOND NONE
ApprovalAgenda Onlyagenda-only · not confirmed spend
BUILDING MODIFICATIONS SHOWN ON THE REMAINING CONTRACT DOCUMENTS: 6. REMOVE EXISTING METAL STAIRS AND RAILING. 23. EXISTING DOWNSPOUTS TO REMAIN. PROTECT DURING DEMOLITION AND ACTIVITIES.
ApprovalAgenda Onlyagenda-only · not confirmed spend
GROUT --- ASTM C1019 --- 2000 psi • STRUCTURAL OBSERVATIONS INDICATED BELOW WILL BE PERFORMED UNDER SEPARATE CONTRACT BY THE
ApprovalAgenda Onlyagenda-only · not confirmed spend
HORIZ. BOND BEAM PER SCHED. M.O. MASONRY OPENING
ApprovalAgenda Onlyagenda-only · not confirmed spend
1 STOP PAYMENT ORDERS MAY TAKE UP TO 30 DAYS.
ApprovalAgenda Onlyagenda-only · not confirmed spend
144 4'-9" 7. GENERAL CONTRACTOR TO OBTAIN BID FOR INSTALLATION OF
ApprovalAgenda Onlyagenda-only · not confirmed spend
BE RESOLVED BEFORE THE CONTRACT IS AWARDED. NO ALLOWANCE
ApprovalAgenda Onlyagenda-only · not confirmed spend
399 3/4" B-1 399 1 1/4" A, C AHJ AUTHORITY HAVING JURISDICTION NIC NOT IN CONTRACT
ApprovalAgenda Onlyagenda-only · not confirmed spend
EACH CELL AND SOLID ROOF BOND BEAMS AT OR
ApprovalAgenda Onlyagenda-only · not confirmed spend
CERAMAR FOAM & FILL TOP 13. A DENOTES SHEARWALL (FULL LENGTH OF WALL SECTION, UNO), RE: S2.1 -3 . APPLY SHEATHING TO SIDE OF * HORIZ. BOND BEAM/CHORD @ ROOF LINE OF FULL HT. CMU - (2) #7 BARS
ApprovalAgenda Onlyagenda-only · not confirmed spend
MAPPED SPECTRAL RESPONSE ACCELERATIONS HORIZ. BOND BEAM (1) #5 BAR @ 48" O.C.
ApprovalAgenda Onlyagenda-only · not confirmed spend
F.G.B. FACE OF GYPSUM BOARD N.I.C. NOT IN CONTRACT TYP. TYPICAL PLYWOOD RIGID INSULATION A13.9 DETAILS R4 REFRIGERATION SCHEDULE CASES
ApprovalAgenda Onlyagenda-only · not confirmed spend
BUILDING MODIFICATIONS SHOWN ON THE REMAINING CONTRACT
ApprovalAgenda Onlyagenda-only · not confirmed spend
M2 1 4 1.4 1.5 1.6 1. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR,
ApprovalAgenda Onlyagenda-only · not confirmed spend
1. GENERAL CONTRACTOR SHALL COORDINATE UTILITY LOCATIONS 1. BUILDING/SITE LIMIT LINE, RE: BID FORM & LEGEND 22. CONCRETE PAD & FLAG POLE, RE: SD2-1 33. COMPACT PARKING STALL, PAINT "COMPACT" CENTERED IN BUILDING/SITE LIMIT LINE TOTAL PARKING REQUIRED 435 STALLS
ApprovalAgenda Onlyagenda-only · not confirmed spend
1. TEMPERATURE SENSOR MOUNTED AT 48" A.F.F. UNLESS OTHERWISE NOTED. 1. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR,
ApprovalAgenda Onlyagenda-only · not confirmed spend
EF-3 DELI HOOD 2,640 1,195 1.25 6.6 1.15 1 1/2 1,195 208V - 3 PH. DIRECT 15.1 179 CAPTIVE AIRE DU180HFA 1,4,6 H-3 PIZZA II 42 54 18 EF-7 900 12" 1,500 EF-7 139 CAPTIVEAIRE 5418 VHB 6, 7 AFF ABOVE FINISH FLOOR NIC NOT IN CONTRACT
ApprovalAgenda Onlyagenda-only · not confirmed spend
CONTRACTION JOINT, TYP. 7. PROVIDE STANDARD LAP AT ALL CONCRETE SLAB-ON-GRADE W.W.F. EDGES, RE: S1.1 -4 . CMU1 8" (1) #5 @ 16" O.C. HORIZ BOND CELLS W/ FOAM OR LOOSE
ApprovalAgenda Onlyagenda-only · not confirmed spend
1. CAMERA SUPPLIED BY CCTV VENDOR.
ApprovalAgenda Onlyagenda-only · not confirmed spend
A SPLIT FACE CMU. RUNNING BOND.
ApprovalAgenda Onlyagenda-only · not confirmed spend
BOND BEAM W/ BEFORE FINISHING OFF THE & REPLACE W/ (N) HSS
ApprovalAgenda Onlyagenda-only · not confirmed spend
4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR
ApprovalAgenda Onlyagenda-only · not confirmed spend
2. STOP HORIZ. BOND BEAM STEEL AT CONTROL JOINT EXCEPT AT ALIGN W/ TYP.
ApprovalAgenda Onlyagenda-only · not confirmed spend
FS HEATERS 1 1/2" BPSCW BOILERS, RE: P4.1-3 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
4266 THE LEGAL AGE TO PURCHASE TOBACCO PRODUCTS IS 21 13 LOCATION: 1 PER CHECKSTANDS A16-3