ApprovalAgenda Onlyagenda-only · not confirmed spend
INSTALLATION SHALL BE IN AGREEMENT WITH THE OVERALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
1. GENERAL CONTRACTOR SHALL COORDINATE UTILITY LOCATIONS 1. BUILDING/SITE LIMIT LINE, RE: BID FORM & LEGEND 22. CONCRETE PAD & FLAG POLE, RE: SD2-1 33. COMPACT PARKING STALL, PAINT "COMPACT" CENTERED IN BUILDING/SITE LIMIT LINE TOTAL PARKING REQUIRED 435 STALLS
ApprovalAgenda Onlyagenda-only · not confirmed spend
RUN LENGTH OF TRENCH SERVICE FROM TELECOM VAULT TO NEW PHONE/DATA ROOM INVOICE TO OWNER FOR PAYMENT BY OWNER.
ApprovalAgenda Onlyagenda-only · not confirmed spend
9. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE 1. SPECIAL INSPECTION IS REQUIRED. PROVIDE SPECIAL INSPECTION TO MEET LOCAL CODE REQUIREMENTS. SUBMITTAL DATES
ApprovalAgenda Onlyagenda-only · not confirmed spend
2950 CLOSED FOR CLEANING 2 LOCATION: PUBLIC RESTROOMS ORDER. IT IS YOUR ONLY PROOF OF PURCHASE. SIDES OF 'C' RACK SCALE POLE AS SHOWN 84K CR58
ApprovalAgenda Onlyagenda-only · not confirmed spend
FS S 4 3 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
CONSTRUCTION SWPPP, AND CONTRACT DOCUMENTS AT THE CONSTRUCTION SITE AT ALL TIMES. COORD COORDINATE R RADIUS
ApprovalAgenda Onlyagenda-only · not confirmed spend
1 STOP PAYMENT ORDERS MAY TAKE UP TO 30 DAYS.
ApprovalAgenda Onlyagenda-only · not confirmed spend
11. ANCHOR STANDBY GENERATOR, AND ANY OTHER LARGE EQUIPMENT TO CONCRETE SLAB PER ARCH CMU3 8" (1) #5 @ 24" O.C. HORIZ BOND NONE
ApprovalAgenda Onlyagenda-only · not confirmed spend
BOND BEAM W/ BEFORE FINISHING OFF THE & REPLACE W/ (N) HSS
ApprovalAgenda Onlyagenda-only · not confirmed spend
HORIZ. BOND BEAM HORIZONTAL REINFORCEMENT IS PLACED SUCH THAT CELLADJACENT TO OPENING.
ApprovalAgenda Onlyagenda-only · not confirmed spend
3. INFILL (E) DECK OPENINGS, RE: ARCH., MECH. & S3.2 -2 . CMU1 8" (1) #5 @ 16" O.C. HORIZ BOND CELLS W/ FOAM OR LOOSE
ApprovalAgenda Onlyagenda-only · not confirmed spend
CONTRACTION JOINT, TYP. 7. PROVIDE STANDARD LAP AT ALL CONCRETE SLAB-ON-GRADE W.W.F. EDGES, RE: S1.1 -4 . CMU1 8" (1) #5 @ 16" O.C. HORIZ BOND CELLS W/ FOAM OR LOOSE
ApprovalAgenda Onlyagenda-only · not confirmed spend
1. TEMPERATURE SENSOR MOUNTED AT 48" A.F.F. UNLESS OTHERWISE NOTED. 1. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR,
ApprovalAgenda Onlyagenda-only · not confirmed spend
FS HEATERS 1 1/2" BPSCW BOILERS, RE: P4.1-3 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
CONTRACT DRAWINGS AND SPECIFICATIONS THAT IMPACT THE FIRE
ApprovalAgenda Onlyagenda-only · not confirmed spend
PRODUCE ROOM R R SHALL BE IN AGREEMENT WITH THE OVERALL CONSTRUCTION
ApprovalAgenda Onlyagenda-only · not confirmed spend
H AND CONFIRM SCOPE OF DEMOLITION PRIOR TO BID.
ApprovalAgenda Onlyagenda-only · not confirmed spend
1. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR,
ApprovalAgenda Onlyagenda-only · not confirmed spend
LEVEL CMU WALL SUPPLIED BY CCTV VENDOR SUPPLIED BY CCTV VENDOR SUPPLIED BY CCTV VENDOR
ApprovalAgenda Onlyagenda-only · not confirmed spend
#5 BOND BEAM @ 48" O.C. W/
ApprovalAgenda Onlyagenda-only · not confirmed spend
INSTALL 18" VENDOR SUPPLIED DIRT LEG
ApprovalAgenda Onlyagenda-only · not confirmed spend
SPRINKLER SYSTEM PRIOR TO BID. ANY QUESTIONS THAT AFFECT THE
ApprovalAgenda Onlyagenda-only · not confirmed spend
P3 PIPING IN 2 1/2" CW PIPING IN PIPING IN WC 4 P5 AND PROOF BOX BY VENDOR. INDIRECT DRAINS FROM BFP-4 TO FLOOR
ApprovalAgenda Onlyagenda-only · not confirmed spend
COLLAR, 4" HIGH "PAR-BOND" GUTTER SEAL 18"
ApprovalAgenda Onlyagenda-only · not confirmed spend
399 3/4" B-1 399 1 1/4" A, C AHJ AUTHORITY HAVING JURISDICTION NIC NOT IN CONTRACT
ApprovalAgenda Onlyagenda-only · not confirmed spend
to its condition before work commenced. ** Permits NON-REFUNDABLE after date of purchase. **
ApprovalAgenda Onlyagenda-only · not confirmed spend
HORIZ BOND CELLS W/ FOAM OR LOOSE
ApprovalAgenda Onlyagenda-only · not confirmed spend
vote are required to grant appeal.
ApprovalAgenda Onlyagenda-only · not confirmed spend
INSTALL (N) CMU WALL (2) #5 BOND BEAM
ApprovalAgenda Onlyagenda-only · not confirmed spend
DISPLAY Peanuts and Tree Nuts 8483 MONEY ORDERS 65¢ PURCHASE AT SERVICE DEPARTMENT 26 LOCATION: 2 PER CHECKSTANDS A16-3
ApprovalAgenda Onlyagenda-only · not confirmed spend
4' ADD ADDITIONAL 2"OF RIGID BOARD INSULATION, PER FOOT OF GREASE AS A BOND-BREAKING MATERIAL JUST PRIOR TO PLACING THE CONCRETE FINISHED 1/4" BELOW
ApprovalAgenda Onlyagenda-only · not confirmed spend
Nor does Workers Coalition's payment of attorney fees to request records, standing
ApprovalAgenda Onlyagenda-only · not confirmed spend
MODIFICATIONS SHOWN ON THE REMAINING CONTRACT DOCUMENTS. THE EXISTING PLUMBING FIXTURES, WATER HEATERS, PUMPS, VALVES, BACKFLOW DOWNSTREAM. SEE GENERAL NOTE 9, THIS SHEET.
ApprovalAgenda Onlyagenda-only · not confirmed spend
3. Neither the claim asserted nor the relief requested requires the individual
ApprovalAgenda Onlyagenda-only · not confirmed spend
2. STOP HORIZ. BOND BEAM STEEL AT CONTROL JOINT EXCEPT AT ALIGN W/ TYP.
ApprovalAgenda Onlyagenda-only · not confirmed spend
RESTROOM RESTROOM 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL
ApprovalAgenda Onlyagenda-only · not confirmed spend
LOCATION / TYPE ROD WIRE SIZE VERT. SPACING STANDARD GRADE (ksi) 1. SPECIAL INSPECTIONS DESCRIBED HEREIN WILL BE PERFORMED UNDER SEPARATE CONTRACT BY AN APPROVED
ApprovalAgenda Onlyagenda-only · not confirmed spend
WILL BE PERMITTED IN THE CONTRACT FOR CHANGES MADE AFTER
ApprovalAgenda Onlyagenda-only · not confirmed spend
COVER @ COMPACTOR DOORS BASE BID DOWELS @ 12" O.C. &
ApprovalAgenda Onlyagenda-only · not confirmed spend
A SPLIT FACE CMU. RUNNING BOND.
ApprovalAgenda Onlyagenda-only · not confirmed spend
4212 PLEASE PLACE EMPTY GROCERY CART AT THE END OF THE 26 LOCATION: 2 PERCHECKSTANDS A16-3 THE LEGAL AGE TO PURCHASE ALCOHOL PRODUCTS IS 21 7095 8 2 LOCATION: BULK FOODS 'C' RACK, MOUNTED ON BOTH A16.2-18
ApprovalAgenda Onlyagenda-only · not confirmed spend
4266 THE LEGAL AGE TO PURCHASE TOBACCO PRODUCTS IS 21 13 LOCATION: 1 PER CHECKSTANDS A16-3
ApprovalAgenda Onlyagenda-only · not confirmed spend
M2 1 4 1.4 1.5 1.6 1. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR,
ApprovalAgenda Onlyagenda-only · not confirmed spend
_____ ACCORDANCE W/ CISCA SEISMIC BUILDING MODIFICATIONS SHOWN ON THE REMAINING CONTRACT
ApprovalAgenda Onlyagenda-only · not confirmed spend
2 CMU3 8" (1) #5 @ 24" O.C. HORIZ BOND NONE
ApprovalAgenda Onlyagenda-only · not confirmed spend
BUILDING MODIFICATIONS SHOWN ON THE REMAINING CONTRACT DOCUMENTS: 6. REMOVE EXISTING METAL STAIRS AND RAILING. 23. EXISTING DOWNSPOUTS TO REMAIN. PROTECT DURING DEMOLITION AND ACTIVITIES.
ApprovalAgenda Onlyagenda-only · not confirmed spend
CMU2 12" (2) #5 @ 16" O.C. HORIZ BOND CELLS W/ FOAM OR LOOSE
ApprovalAgenda Onlyagenda-only · not confirmed spend
CERAMAR FOAM & FILL TOP 13. A DENOTES SHEARWALL (FULL LENGTH OF WALL SECTION, UNO), RE: S2.1 -3 . APPLY SHEATHING TO SIDE OF * HORIZ. BOND BEAM/CHORD @ ROOF LINE OF FULL HT. CMU - (2) #7 BARS
ApprovalAgenda Onlyagenda-only · not confirmed spend
BE RESOLVED BEFORE THE CONTRACT IS AWARDED. NO ALLOWANCE
ApprovalAgenda Onlyagenda-only · not confirmed spend
HORIZ. BOND BEAM PER SCHED. M.O. MASONRY OPENING
ApprovalAgenda Onlyagenda-only · not confirmed spend
USE RUNNING BOND EXCEPT AS NOTED.
ApprovalAgenda Onlyagenda-only · not confirmed spend
MAPPED SPECTRAL RESPONSE ACCELERATIONS HORIZ. BOND BEAM (1) #5 BAR @ 48" O.C.
ApprovalAgenda Onlyagenda-only · not confirmed spend
HANDS PRIOR TO COMMENCING WORK (12" x 12") SET TOP OF SIGN @ 105'-2", REFUNDED FOR THREE BUSINESS DAYS AFTER PURCHASE SIDES OF 'C' RACK SCALE POLE AS SHOWN
ApprovalAgenda Onlyagenda-only · not confirmed spend
#4 @ 16" O.C. (1) #5 CONT. #5 HORIZ. BOND BEAM
ApprovalAgenda Onlyagenda-only · not confirmed spend
GROUT --- ASTM C1019 --- 2000 psi • STRUCTURAL OBSERVATIONS INDICATED BELOW WILL BE PERFORMED UNDER SEPARATE CONTRACT BY THE
ApprovalAgenda Onlyagenda-only · not confirmed spend
TABLE N5.4-1 INSPECTION TASKS PRIOR TO WELDING: ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES ITEM CONTINUOUS PERIODIC DETAILED INSTRUCTIONS AND FREQUENCIES 1. SPECIAL INSPECTIONS DESCRIBED HEREIN WILL BE PERFORMED UNDER SEPARATE CONTRACT BY AN APPROVED
ApprovalAgenda Onlyagenda-only · not confirmed spend
3. Grant such other and further relief as the Board deems just and appropriate.
ApprovalAgenda Onlyagenda-only · not confirmed spend
110' - 8 1/2" METAL ROOF PANELS, 1/4 SOLID GROUTED BOND BEAM W/ #5 CONT.
ApprovalAgenda Onlyagenda-only · not confirmed spend
4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR